UPDATE: 4th Line CLOSED NOVEMBER 29 TO JANUARY 31 2011

I had made an error in my post.  I stated the intersection of LSL and JSP will have an all way stop.  JSP traffic will NOT be required to stop at that intersection.  LSL traffic will have stop signs.  Notices have been posted at the intersection and many thanks to Joseph Choi from the Region of Halton for pointing that information out to me.

NOTICE OF ROAD CLOSURE TO ALL MILTON DRIVERS

4th Line South of Louis St Laurent will be closed by the Region of Halton to instal watermains starting Monday November 29th and will remain closed until January 31, 2011 (approximately) Local access only will be allowed.

The detours will be marked apparently as James Snow Parkway south of Louis St Laurent is now open to Britannia Road. 

This will result in heavier than normal traffic at the intersection of James Snow Parkway and Derry Road and south on JSP as well.  A reminder to motorists who use Clark Blvd to go north on JSP to be extra cautious when making a left hand turn with the increased flow of traffic.

Another reminder that the speed limit on JSP is 70km/hr and there is only a two way stop at the intersection of JSP and LSL.  JSP traffic going north and south will NOT be required to stop, and traffic coming eastward on LSL WILL HAVE to stop at the stop sign.

Please email me if you have any further questions.

mike@mikecluett.ca


Comments

One response to “UPDATE: 4th Line CLOSED NOVEMBER 29 TO JANUARY 31 2011”

  1. frustrated driver Avatar
    frustrated driver

    Thanks for posting this Mike. Its good news that this road is finally open.

    I think I speak for a lot of people in our ward that we really do appreciate these regular updates to your blog. I have it bookmarked and I suggest others do the same thing. Mike’s walking the walk with his promise to keep people informed of whats happening in Milton.

    Great job! I’m very happy you are our councillor.